SCOPE
Supply and install high wall split systems to four portable buildings/classrooms.
PROJECT
TBS Air and Energy Solutions was awarded this small project to supply and install four high wall split systems into four portable buildings. Due to the end users requirements, we undertook some of the installation at the holding hard and completed the installation once the buildings were transported and positioned at the school. This reduced the time needed at the school while also reducing transport risks with units mounted after transport.
CHALLENGES
Due to the portables construction and air conditioner placement requirements there was last minute alterations needing to be done to adequately support the air conditioners. Our team were able to come up with a cost effective solution which enabled the air conditioner to be mounted in the desired position and without impacting the project deadline.
The client and end user were very happy with the end result and how neatly it was presented. Another great installation by the TBS team with the installation completed on time and safely with no incidents.